Blog

ONE WEEK LEFT TO COMMENT ON BY-PASS ROAD IN HERMANUS

ONE WEEK LEFT TO COMMENT ON BY-PASS ROAD IN HERMANUS

Overstrand Municipality

ONE WEEK LEFT TO COMMENT ON BY-PASS ROAD IN HERMANUS

The community of Overstrand has only five days left to respond to the amendments of the revised environmental impact report (EIR) for the proposed Hermanus by-pass.

Comments must be addressed to Kelly Armstrong, karmstrong@srk.co.za, phone 021 659 3083, on or before Monday, 31 August 2020.

Overstrand Executive Mayor, Dudley Coetzee, stated that: "This matter is of huge interest to the public.” He reminded residents to please submit their comments on the report on time.

Documents can be accessed here.

ONE WEEK LEFT TO COMMENT ON BY-PASS ROAD IN HERMANUS

Overstrand Municipality

In the background, though, a top performer—Overstrand Municipality—labours relentlessly to ensure this treasure trove’s clockwork ticks over smoothly. Providing municipal services to an area exceeding 1708 km2 with a population well in excess of the estimated 74500 souls is no easy feat, as th...

View Profile

What is Xplorio?

Xplorio is your local connection allowing you to find anything and everything about a town.

WATCH THE VIDEO: Welcome to Hermanus
Read More

Recent Posts

Hermanus licensing and registration office open every second Saturday

Hermanus licensing and registration office op...

Overstrand Traffic Department in Hermanus will once again open its doors from 1 October on every second Saturday.

COASTAL CLEAN-UP: 170+ Plastic Beverage Bottles Collected at Die Gruis

COASTAL CLEAN-UP: 170+ Plastic Beverage Bottl...

On Wednesday, 16 September 2020, Overstrand Municipality took Cape Nature Walker Bay and the Department of Environmental Affairs’ (DEA)...

CAUTION: HEMEL-EN-AARDE ROAD

CAUTION: HEMEL-EN-AARDE ROAD

We have been made aware of a big pothole in the left outgoing lane from Hermanus...

Alert Level 1 as of midnight on Sunday, 20 September 2020

Alert Level 1 as of midnight on Sunday, 20 Se...

South Africa will move to Alert Level 1 as of midnight on Sunday, 20 September 2020.

Stay Safe - Move Forward

Stay Safe - Move Forward

Let’s keep on washing our hands, wearing our masks properly and keeping a 1.5 m distance.

Feedback on the upgrading of R43 road between Stanford and Hermanus

Feedback on the upgrading of R43 road between...

He concluded that the plan is to have traffic on the service road by 9 September 2020.