Blog

Load-shedding at Higher Stages Impacts on Infrastructure

Load-shedding at Higher Stages Impacts on Infrastructure

Overstrand Municipality

Load-shedding at higher stages impacts on infrastructure and day-to-day operations of service delivery

The Overstrand Municipality is affected by load shedding as much as any other business in the region.

With the start of the holiday season and the increase in visitors, the Municipality's water and sanitation infrastructure is put under increased pressure once more.

The move by Eskom to stage 6 electricity load shedding, with periods of interruption of electricity supply of up to 4.5 hours at a time, and up to 12 hours in total in a 24-hour period, does not help the situation either.

Unfortunately, not all installations are equipped with generators at this stage. Residents of some high-lying areas may temporarily experience low water pressure and even water supply interruptions because of extended load-shedding events, where reservoirs cannot be filled adequately during periods between load shedding, or where booster pump systems are out of operation during load-shedding events.

Some sewerage pump stations which are not equipped with generators may spill during extended periods of load shedding.  Warning signs will be erected where necessary.

Residents and visitors are requested to use water sparingly, as this will assist in firstly conserving reservoir levels and secondly reducing wastewater flows and alleviating pressure on sewerage pump stations. The municipality is doing its utmost to manage the situation within its capacity and available resources.

 
The municipality has implemented the following mitigation measures at this stage:

1. Most of the critical water and wastewater installations are equipped with standby generators, which are supplied with diesel continuously and are being monitored to ensure seamless switchovers as far as possible.

2. Mobile generators are deployed at a few other sensitive water and wastewater installations.

3. Suction tankers are deployed at some sewerage pump stations in environmentally sensitive areas that are not equipped with generators yet.

4. Water and wastewater pump operations are maximized during periods between load-shedding events.

Load-shedding at Higher Stages Impacts on Infrastructure

Overstrand Municipality

In the background, though, a top performer - Overstrand Municipality - labours relentlessly to ensure this treasure trove’s clockwork ticks over smoothly. Providing municipal services to an area exceeding 1708 km2 with a population well in excess of the estimated 74500 souls is no easy feat, as th...

View Profile

What is Xplorio?

Xplorio is your local connection allowing you to find anything and everything about a town.

WATCH THE VIDEO: Welcome to Pringle Bay & Rooi Els!
Read More

Other Articles

Kidscan! Online Auction Alert

Kidscan! Online Auction Alert

Get ready for an exciting online auction in support of Kidscan!

Kidscan!
Successful Wall Transformation with Wilkoo Products

Successful Wall Transformation with Wilkoo Products

We’re excited to share a recent project by Superb Home Maintenance, where they used Wilkoo products to tackle a challenging exterior wall. 

Rentals, Surf Gear, Dive Gear, and Leisurewear

Rentals, Surf Gear, Dive Gear, and Leisurewear

At Pringle Bay Surf & Sport Shop, we’ve got everything you need for your next adventure. 

Introducing Prominent Neuklad Range

Introducing Prominent Neuklad Range

Use Prominent Neuklad in conjunction with Prominent Neuklad Range Alkali-Resistant Sealer to ensure long-lasting protection.

Support Kidscan! - Visit Our Charity Shops in Kleinmond or Pringle Bay

Support Kidscan! - Visit Our Charity Shops in Kleinmond or Pringle Bay

We need your support to continue our mission of helping underprivileged and vulnerable primary school children.

Kidscan!
Lemon Meringue Cheesecake

Lemon Meringue Cheesecake

When life hands us lemons, we turn them into lemon meringue cheesecake! 

See All Articles