MUNICIPAL ACCOUNTS (METER READINGS AND REPLACEMENTS)

MUNICIPAL ACCOUNTS (METER READINGS AND REPLACEMENTS)

Overstrand Municipality

MUNICIPAL ACCOUNTS (METER READINGS AND REPLACEMENTS)

Following various enquiries and complaints about the monthly municipal accounts, with regard to water consumption, or zero consumption invoiced on the accounts, the Overstrand Municipality would like to share the following information:

 
1) METER READINGS

The Municipality, since August 2021, had several meter readings challenges but we can confirm that this has improved significantly, and we trust it will be solved by 31 March 2022. The areas still posing a challenge are meters inaccessible to read, or in areas where plots/properties are significantly overgrown. There should thus be only the minimum number of water meters across the whole of the Overstrand area that are still investigated in this regard.

The Municipality monitors and analyses a system generated exception report.  Due to the Overstrand being a holiday destination with related property ownership, unpredictable occupation of properties occurs, impacting on consumption patterns and the valid exception classification for holiday homes.

The following serves as an example of invoicing consumption on an account, to demonstrate afore-mentioned:  

 • September consumption due to occupation = 4 kl

 • October consumption due to no occupation = 0 kl

 • November consumption due to no occupation = 0 kl

 • December consumption due to occupation = 12 kl

Above example explains the possible impact of water consumption of 4 kl in one month, and 0 kl consumed per month for the next two months, and then a consumption of 12 kl in the fourth month, will result in more than 100% spike/deviation, but does not mean the reading is incorrect at all.  This is mainly due to variances in occupancy levels of the property.

Furthermore of importance to note is that actual consumption for December will only be invoiced and reflect on the January account when the reading for the period is available.  

The dates between readings also play an important role as the system provides for calculation in accordance with the number of days, thus, if it is a longer period, you will receive more kl units consumed per sliding scale, to avoid incorrect charging, (example, 45 days’ consumption will be calculated as 30 days as well as another 15 days on the lower tariff of the sliding scale).

GANSBAAI AREA and Reading Dates (from - to) 

 • Baardskeerdersbos 28 - 28

 • Birkenhead 28 - 28

 • Buffelsjag 12 - 12

 • Blompark 10 - 11

 • De Kelders 10 - 14

 • Franskraal 1 - 7

 • Gansbaai 1 - 7

 • Gansbaai Industrial Park 28 - 28

 • Kleinbaai 1 - 3

 • Masakane 13 - 13

 • Pearly Beach 1 - 7

 • Farms Bredasdorp 12 - 12

 • Farms Caledon 1 - 7

 • Bulk Meters 29 - 30

KLEINMOND 

 • Betty's Bay 1 - 15

 • Hangklip Estates 1 - 15

 • Kleinmond 29 - 15

 • Kleinmond Extention 6 11 - 12

 • Overhills 11 - 12

 • Pringle Bay 1 - 15

 • Protea Dorp 11 - 12

 • Rooiels 15 - 15

 • Caledon Farms 1 - 5

STANFORD 

 • Stanford 1 - 5

HERMANUS 

 • De Bos Dam 4 - 6

 • Eastcliff* 9 - 12

 • Fisherhaven 7 - 8

 • Hermanus Beach Club 29 - 4

 • Hermanus Heights* 12 - 12

 • Hawston 4 - 6

 • Hermanus Industrial* 29 - 30

 • Mount Pleasant 29 - 12

 • Mooisig 14 - 14

 • Northcliff* 4 - 8

 • Onrus River 11 - 12

 • Sandbaai 29 - 4

 • Voëlklip* 12 - 18

 • Vermont 9 - 10

 • Westcliff* 29 - 4

 • Zwelihle 29 - 4

 
2) METER REPLACEMENTS

The Community Services Directorate of Overstrand Municipality has an ongoing replacement program for water meters older than 12 years.  

The areas affected/impacted in some instances substantially, with consequences on subsequent meter readings and invoicing in the consecutive periods only. These spikes will be deferred as indicated below. The replacement program is as follows:

Water Meter Replacement 

 • Rooiels: 41 Completed

 • Pringle Bay: 131 Completed

 • Betty's Bay: 202 Completed

 • Kleinmond: 552 Completed

 • Fisherhaven: 112 Period: 22/01/2021 – 27/01/2021

 • Hawston: 1 290 Period: 02/02/2021 – 25/11/2021

 • Vermont: 305 Period: 11/06/2021 – 21/06/2021

 • Onrusrivier: 287 Period: 22/06/2021 – 25/08/2021

 • Sandbaai: 128 Period 02/09/2021 – 27/11/2021

 • Mount Pleasant: 275 Period: 29/11/2021 - Current

TOTAL: 3 323  

Overstrand Municipality is aware that meters have been replaced in Sandbaai and are currently being processed on the financial system. This means that consumers will receive more than one month’s consumption on their municipal account. The Municipality will attend to the correct spread of consumption, when invoicing in accordance with the total period involved, for example 55 days, etc.

The Municipality will defer the water consumption costs related to the meter replacement project impact, over six (6) months, thus avoiding a big impact on consumers.  

Please contact your nearest office should you not understand your account, or send an email to enquiries@overstrand.gov.za

We also kindly request that you continue to pay your average account if no consumption appears on your account and inform the Municipality accordingly.  Your consumption information can then be verified to prevent any subsequent queries on your account in the following months.

Issued by Dr. Annelie Rabie

Office of the Overstrand Executive Mayor 

C: 083 457 8711

MUNICIPAL ACCOUNTS (METER READINGS AND REPLACEMENTS)

Overstrand Municipality

Overstrand Municipality serves the communities of Gansbaai, Stanford, Hermanus, and Hangklip / Kleinmond, including suburbs, settlements, and villages. With a population of over 135,000 people spread across more than 1,700 km², Overstrand Municipality plays a central role in keeping day-to-day life...

View Profile

What is Xplorio?

Xplorio is your local connection allowing you to find anything and everything about a town.

WATCH THE VIDEO: Welcome to Pringle Bay & Rooi Els!
Read More

Other Articles

20 Days to Christmas: Check-off Time

20 Days to Christmas: Check-off Time

Is there anything you didn’t manage to complete this week? 

19 Days to Christmas: Lazy Time

19 Days to Christmas: Lazy Time

School sports are finished. The crazy rush-around of a Saturday is done. You have a few extra hours on hand.

The Mirror Within

The Mirror Within

We look at other relationships through the prism of our personal relationship with self.

21 Days to Christmas - Travel Time

21 Days to Christmas - Travel Time

No matter if you fly or drive to your holiday destination, put some thought into the travel time. 

22 Days to Christmas

22 Days to Christmas

Let everyone write down the movies they would like to watch. 

The Power of Self-Love

The Power of Self-Love

You are a gift, why would you discard yourself?

See All Articles