Overstrand Municipality Explores Alternative Energy

Overstrand Municipality Explores Alternative Energy

Overstrand Municipality

Overstrand Municipality Explores Alternative Energy

The national government recently changed the country’s energy regulation, allowing municipalities to purchase electrical energy directly from independent power producers (IPPs) and/or to develop their own generation facilities.

According to Overstrand Executive Mayor, Dudley Coetzee, this opens opportunities for the municipality to investigate a variety of renewable energy projects to “see if we can purchase electricity from renewable energy independent power producers to reduce our dependence on Eskom”.

He confirmed that Overstrand Municipality has been selected to take part in two provincial initiatives aimed at taking advantage of the new energy regulations, namely the Sustainable Infrastructure Development and Financial Facility (SIDAFF) as well as the Municipal Energy Resilience Project (MER).

In addition to the two Provincial Government programmes mentioned above, the Municipality has embarked on the following activities as a first step in a long journey to minimise load shedding:

 • The municipality has an active Small-Scale Embedded Generation (SSEG) program, with 25 clients taking part in the program. This program allows municipal clients with renewable energy generation capacity, for own use on their own land, to feed excess energy into the municipal electricity network.

The programme started in 2016 and the municipality has a total SSEG capacity of 201kVA connected to the grid.

 • The municipality is in discussion with two IPPs regarding the installation of Solar Photo Voltaic plants in Kleinmond (18MW) and Gansbaai (10MW).

 • The municipality is in discussion with renewable energy company, regarding the installation of a pilot Microbial Fuel Cell (MFC) system for the generation of electricity from municipal waste water at the Waste Water Treatment Plant. The project is for a phased implementation, starting with a small pilot plant and over time increasing the capacity up to 5 MW.

 • The municipality is in discussion with energy trading company regarding a pilot project to assist them to obtain an electrical power trading license from NERSA. The pilot project is for a capacity of 1 MW and can be expanded.

It should be noted that this journey to increase the renewable energy capacity will not be short one due to a number of factors outside the control of the municipality. However, the public can rest assured that there is political and administrative will to ensure that the intent to increase renewable energy capacity is realised.

Image 1
Photo Credit: Internet
Overstrand Municipality Explores Alternative Energy

Overstrand Municipality

In the background, though, a top performer—Overstrand Municipality—labours relentlessly to ensure this treasure trove’s clockwork ticks over smoothly. Providing municipal services to an area exceeding 1708 km2 with a population well in excess of the estimated 74500 souls is no easy feat, as th...

View Profile

What is Xplorio?

Xplorio is your local connection allowing you to find anything and everything about a town.

WATCH THE VIDEO: Welcome to Hermanus
Read More

Other Articles

Enter our Lucky Draw!

Enter our Lucky Draw!

You could win the lucky draw!

Practice Closed Dates

Practice Closed Dates

The practice will be closed on the following dates.

Free Gentle 2-Day Detox

Free Gentle 2-Day Detox

Now is the ideal time to detox your body, mind and soul.

Greepharm Products

Greepharm Products

Please order at least 7-10 days before collection.

Traffic Department Opening Hours

Traffic Department Opening Hours

The Hermanus Traffic Department will be open on Saturday morning.

CLOSING OF MUNICIPAL OFFICES OVER FESTIVE PERIOD

CLOSING OF MUNICIPAL OFFICES OVER FESTIVE PERIOD

Municipal offices, including libraries, will be closed from 13:00 on Friday 24 December 2021 and Friday 31 December 2021.

See All Articles