Many residents in Overstrand want to compare costs between credit meters and pre-paid electricity meters.

As can be seen, residents who make use of pre-paid electricity, pay less per unit than those who make use of a credit meter. The reason is that no meter readings need to be taken by the municipality and the payment is received immediately.

On the other hand, payment for electricity consumed on a credit meter (with slightly more expensive tariffs) is received approximately 60 days later only, after the meter was read at the end of the period, the account being prepared and send, with a further number of days’ leniency, up to due date by the 20th of the following month. The deposit applicable on the credit meter is two times the average consumption during the preceding 12 months, while the deposit payable on the prepaid meter is R604.00 for single phase, two part tariff.

The table below sets out the comparison between credit meters and pre-paid electricity meters (VAT included). Sliding scales are applicable in both instances.

The following comparison is done with 700kWh units consumed/purchased per month:

Credit Meter

Tariff Structure_Block 1: 0 - 350 kWh

Unit-per-kWh usage_350 x tariff per unit_R1.5717 = R550.10

Pre-paid Meter

Tariff Structure_Block 1: 0 – 350 kWh

Unit-per-kWh usage_350 x tariff per unit_ R1.4518 = R508.13

Price difference: R 41.97

Credit Meter

Tariff Structure_ Block 2: 351 - 600 kWh

Unit-per-kWh usage_250 x tariff per unit_R2.3083 = R577.08

Pre-paid Meter

Tariff Structure_ Block 2: 351 - 600 kWh

Unit-per-kWh usage_250 x tariff per unit_R2.1752 = R543.80

Price difference: R33.28

Credit Meter

Tariff Structure_ Block 3: > 600 kWh

Unit-per-kWh usage_100 x tariff per unit_R2.8361 = R283.61

Pre-paid Meter

Tariff Structure_ Block 3: > 600 kWh

Unit-per-kWh usage_100 x tariff per unit_ R2.7262 = R272.62

Price difference: R10.99

• For 700 units used you will pay R1 820.41 for credit meter and R1 734.18 for Pre-Paid meter (price difference is R86.23)

Electricity - CREDIT METER VS PRE-PAID METER

Overstrand Municipality

Overstrand Municipality serves the communities of Gansbaai, Stanford, Hermanus, and Hangklip / Kleinmond, including suburbs, settlements, and villages. With a population of over 135,000 people spread across more than 1,700 km², Overstrand Municipality plays a central role in keeping day-to-day life...

View Profile

What is Xplorio?

Xplorio is your local connection allowing you to find anything and everything about a town.

Watch the Stanford Video
Read More

Other Articles

Define Your Ultimate Experience

Define Your Ultimate Experience

Do you have any idea what your ultimate dream will feel like?

Your Business Can Only Grow as Far as You Do

Your Business Can Only Grow as Far as You Do

Self-belief is the driving force of a goal.

Overcome Fear and Stagnation to Achieve Business Success

Overcome Fear and Stagnation to Achieve Business Success

Your business may be the dream you once imagined - but you are the driving force behind it.

Stop Surviving and Start Building the Business You Envisioned

Stop Surviving and Start Building the Business You Envisioned

Struggling to survive today, does not feed the bigger picture.

Resistance Results in Self-Sabotage

Resistance Results in Self-Sabotage

Resistance results in self-sabotage.

18 September 2026: Beshara

18 September 2026: Beshara

Get ready for Beshara's amazing performance this Friday! 

La Cantina Stanford
See All Articles