Pump Service Project - Aqunion Abalone Farm, Hermanus
Combined Engineering Solutions (CES) in Gansbaai recently serviced a water pump at the Aqunion abalone farm in Hermanus. We fully disassembled the pump, cleaned all the parts, and identified the problems while it was stripped. The necessary components were replaced before we reassembled the entire unit.

Before Images Above
Once the pump was back together, we repainted it with a base coat and a clear coat to give it a clean, refreshed finish.

After Images Above
If you need assistance with any similar pump servicing or engineering work, feel free to contact CES. We’re ready to help.










